Client: RWE
PC and Civils: Farrans
Turbine: Vestas
Site Management: Coast Renewable Services and AFF wind services
Installation and Crane: AIS
We were involved in the Camster II project, providing site management throughout the entire duration of the project.
Located in Caithness, this onshore site involved the construction of ten Vestas V112 turbines, with a combined capacity of 36MW – enough to power approximately 35,000 households.
Thanks to strong teamwork and great collaboration among all contractors, the project was delivered safely, with a positive safety culture resulting in zero accidents or lost time incidents.
A huge well done to everyone involved in the project, its great to see it successfully completed.