Overview

A client called us out after an HV cable failed inside one of their turbine towers, putting the turbine offline.

Coast Approach

Once the fault was reported, our team mobilised to site and isolated the turbine before starting work.​

The damaged HV cable was removed from the tower and a new length run and terminated in its place under CDM regulations as Principal Contractor.​

We tested the new cable before re-energising the turbine and handing it back to the client.

Deliverables

​We removed the damaged cable and had a new one installed and terminated. The turbine was back up and running with minimal downtime despite the complexity of the job